websights
← SimScale Blog

Manufacturing

Latest articles

What Real Robotics Teams Are Learning from Simulation

The real world is unkind to robots. A legged inspection robot has to survive being dropped, knocked, and run through

Alex Graham June 30, 2026
Machinery & Industrial Equipment, Manufacturing
Non-Linear Rubber Simulation Cover Image

How to Run a Non-Linear Rubber Simulation: Bidirectional Sealing System Walkthrough

You already know rubber breaks linear FEA in three ways at once: large strain, near-incompressibility, and frictional contact. What you

itsavlidis May 6, 2026
FEA, Manufacturing, Product
Guide to Non-linear Material Models Cover Image

Guide to Nonlinear Material Models

Your linear FEA results say the bracket is fine. The prototype just cracked in testing. What went wrong? Chances are,

Richard Szöke-Schuller March 26, 2026
FEA, Manufacturing
Magnetic pulse welding cover image

Induction Heating Simulation for Magnetic Pulse Welding

This induction heating simulation walks through how to evaluate the electromagnetic efficiency of a magnetic pulse welding system — from

Khairi Deiri March 17, 2026
Electromagnetics, Electronics & High Tech, Manufacturing, Product
Implicit Modeling Cover Photo

Cold Plate Cooling Design

Cold plate cooling has moved from an overlooked detail to a core design driver because today’s systems operate hotter, denser

Alexander Fischer December 5, 2025
CFD, Machinery & Industrial Equipment, Manufacturing, Thermal Simulation
Implicit Modeling Cover Photo

Implicit Modeling

When geometry stops being drawn and starts being defined, design changes forever. For decades, the language of design has been

Alexander Fischer November 20, 2025
Engineering AI, Manufacturing, Physics AI, Product

Webinar Highlights: Unlock Magnetic Pulse Welding Simulation

In our recent webinar, our application engineering team dove deep into the transformative realm of electromagnetic simulations, specifically focusing on

Peter Selmeczy September 26, 2025
Electromagnetics, Manufacturing
SimScale simulation images showing the benefits of AI simulation

AI for Engineering Design and Manufacturing

For today’s engineering leaders, the operating environment has become a crucible of competing pressures – pun fully intended! The market

Peter Selmeczy August 28, 2025
Engineering AI, Manufacturing, Physics AI

How Modern Manufacturing Simulation Software Drives Maximum Efficiency

The New Mandate for Engineering Leaders: Innovate Faster Under Unpreprecedented Pressure The industrial machinery sector is in the midst of

Peter Selmeczy July 8, 2025
Machinery & Industrial Equipment, Manufacturing
Nantoo Webinar Featured Image

Webinar Highlights: Optimizing Home Appliance Design with Cloud-Native Simulation and Physics AI

Last week, we were joined by the innovative team from Nantoo, a company developing sustainable solutions for green space maintenance.

Peter Selmeczy June 17, 2025
CFD, Consumer Products, Manufacturing, Physics AI, Product
Industrial Manufacturing Trends in 2025: Embracing Innovation for a Competitive Edge Cover Image

Industrial Manufacturing Trends in 2025

“Manufacturers must embrace continuous adaptation or risk falling behind.” That’s a strong sentiment to start an article with. And, really,

Peter Selmeczy June 16, 2025
Machinery & Industrial Equipment, Manufacturing
cfd - aero car

Top Engineering Software for Advanced Analysis: A Guide to Innovation and Efficiency

For engineers, solving real-world challenges often begins with the right tools. Engineering software goes beyond numbers and models. It helps

Samir Jaber December 11, 2024
Automotive & Transportation, CFD, Electronics & High Tech, FEA, Machinery & Industrial Equipment, Manufacturing, Product, Thermal Simulation

Physics Modeling Software: The Ultimate Guide to Physics Simulation

Engineering challenges are growing more complex as industries demand higher efficiency, precision, and innovation. To meet these demands, engineers need

Samir Jaber December 10, 2024
AEC, Automotive & Transportation, CFD, Electromagnetics, Electronics & High Tech, FEA, Machinery & Industrial Equipment, Manufacturing, Product, Thermal Simulation
Compressor case of a turbo jet

Axial Compressor Design & Simulation

In industries like aerospace and energy, even a minor flaw can mean costly delays or equipment failures. This applies to

Samir Jaber November 14, 2024
Aerospace & Defense, CFD, Energy, Machinery & Industrial Equipment, Manufacturing
Electromagnetic clutch design analyzed using SimScale EM Simulation

Electromagnetic Clutch Design: Simulate and Optimize

Electromagnetic clutches are used where precise control of power transmission is essential. From automotive systems to industrial machinery, these clutches

Samir Jaber September 27, 2024
Aerospace & Defense, Automotive & Transportation, Electromagnetics, Machinery & Industrial Equipment, Manufacturing
Next

Get started today