Step-by-Step Tutorial Session 1 - Front Wing Design Study (Part 1)

Hi, @drodriguez32 @jousefm
I’m Michelotti Andrea. I’m having some trouble because I received the message “The maximum run time of this job would exceed your computation quota.” but I already have a Community Plan. Maybe, I have used all the hours during the last year.
Do you know how I can solve this problem?
Thanks in advance
Andrea