How can I run a long duration transient simulation?

I am trying to model a geothermal heat exchanger using a transient conjugate heat transfer model.

The simulation needs to model 1 month of heat exchange, with only laminar flow - is there a way to model this efficiently with SimScale? Any help would be greatly appreciated!

Hi @C4wley, thanks for posting!

I have never seen any transient study being run for such a long time period, so in short I would say this isn’t possible in SimScale.

This video tends to be very helpful to users who desire to run longer transient studies (not 1-month though!)

Cheers
Igor