SimScale logo
Set up your own cloud-native simulation in minutes.Start Simulating Now

Improving dam capacity using a dredger to remove sediment and prevent environmental pollution during the recovery process

Open Project
Copy Project
Improving dam capacity using a dredger to remove sediment and prevent environmental pollution during the recovery process image
views 408
shares 0
kmokele
Created

Last modified

Statistics
geometries 2 Geometries
meshes 3 Meshes
simulations 3 Simulation setups
runs 7 Results

About this project

The goal is to design a dredger that will remove excess sediment build-up. This dredger has a cutter head that separates sediment from the waterbed and is drawn into the pump through the suction pipe. This pipe is housed on a ladder that is controlled by the hydraulic cylinder. A simulation and stress analysis will be done on the hydraulic cylinder which carries most the load of the ladder.