Ventilation System Design for Carbon Monoxide Extraction from Parking Garage using CFD
0 268 1
Statistics
1 Geometry 2 Meshes 2 Simulation setups 7 Results
About this project
The purpose of the simulation is to compare between the performances of different ventilation schemes, the conventional low level supply, high level exhaust system and a proposed system with low level exhaust and high level supply and predict the distributions of CO mass fraction and velocities at different operating scenarios to meet the tenability criteria.
Related Projects
Project History
ChiHin created this project
Set up your own cloud-native simulation in minutes.Start Simulating Now