I have been running an in-compressible flow simulation but the maximum run time was less than required. The computation has stopped showing error. It has completed 76% of the computation. Can I change the maximum run time and continue the same run?
Unfortunately that’s not yet possible on our platform but I think there has been a similar request in the past by my colleague Darren (@1318980)! At the current state you need to increase the simulation time and re-run the simulation.